St. Joseph’s Health Care, Hamilton Charlton Site
- New Chiller Plant and Boiler Replacement
- Two(2) 1,000 ton York centrifugal chillers complete with ventilation, pumps, piping, and insulation
- Six(6) 500 ton BAC cooling towers complete with structural steel
- New 1500 hp Thermogenics high pressure steam coil-tube boiler system including breaching
|
 |
|
|
Bombardier Aerospace
- Replacement of existing 1,800 ton chiller with new 1,400 Carrier centrifugal chiller with Toshiba Variable Frequency Drive
- Replacement of twenty four (24) chilled water coils for makeup air to painting building
- Replace existing domestic hot water tank with new instantaneous steam to domestic hot water heat exchanger
|
 |
|
|
Jarvis Collegiate Institute
- Steam Boiler Plant Replacement
- Two (2) 337 Hp and One (1) 60 Hp Smith Low Pressure Steam Boiler
- Complete turnkey installation complete with new feed-water, condensate, blow-down, breaching, combustion ventilation, controls, electrical, and general trades work
|
 |
|
|
Winston Churchill Collegiate Institute
- HVAC Retrofit
- Replacement of Eight (8) air-handling units and Thirty-six (36) exhaust fans
- Complete with steam, hot water, refrigeration, sheet metal, controls, electrical, and civil work
|
 |
|
|
Pickering Civic Centre
- New Humidification systems for Pickering City Hall
- Two (2) new 300 lb/hr gas-fired steam Nortec humidifiers complete with new steam distribution grids, condensate recovery, venting, roofing, and civil work
|
 |
|
|
Rohm and Haas Canada
- Numerous chemical piping and mechanical contracting projects over the last fourteen (14) years (too many to list)
- Specializing in stainless steel and carbon steel pipefitting and welding
|
|
|
|
Arla Foods Inc.
- Completion of culinary & process steam, hot water, compressed air, and condensate piping throughout cheese plant during production over a 2 year period
|
|
|
|
Earl Beatty Public School
- New 11,000 cfm air-handling unit installation for pool ventilation and hot water heating complete with new fluid cooler, water-cooled screw chiller, heat recovery system, steam to hot water conversion, electrical, controls, sheet metal, and civil work.
|
|
|
| |
|