St. Joseph’s Health Care, Hamilton Charlton Site
  • New Chiller Plant and Boiler Replacement
  • Two(2) 1,000 ton York centrifugal chillers complete with ventilation, pumps, piping, and insulation
  • Six(6) 500 ton BAC cooling towers complete with structural steel
  • New 1500 hp Thermogenics high pressure steam coil-tube boiler system including breaching
St. Joseph’s Health Care, Hamilton Charlton Site
Bombardier Aerospace
  • Replacement of existing 1,800 ton chiller with new 1,400 Carrier centrifugal chiller with Toshiba Variable Frequency Drive
  • Replacement of twenty four (24) chilled water coils for makeup air to painting building
  • Replace existing domestic hot water tank with new instantaneous steam to domestic hot water heat exchanger
Bombardier Aerospace
Jarvis Collegiate Institute
  • Steam Boiler Plant Replacement
  • Two (2) 337 Hp and One (1) 60 Hp Smith Low Pressure Steam Boiler
  • Complete turnkey installation complete with new feed-water, condensate, blow-down, breaching, combustion ventilation, controls, electrical, and general trades work
Jarvis Collegiate Institute
Winston Churchill Collegiate Institute
  • HVAC Retrofit
  • Replacement of Eight (8) air-handling units and Thirty-six (36) exhaust fans
  • Complete with steam, hot water, refrigeration, sheet metal, controls, electrical, and civil work
Winston Churchill Collegiate Institute
Pickering Civic Centre
  • New Humidification systems for Pickering City Hall
  • Two (2) new 300 lb/hr gas-fired steam Nortec humidifiers complete with new steam distribution grids, condensate recovery, venting, roofing, and civil work
Winston Churchill Collegiate Institute
Rohm and Haas Canada
  • Numerous chemical piping and mechanical contracting projects over the last fourteen (14) years (too many to list)
  • Specializing in stainless steel and carbon steel pipefitting and welding
 
Arla Foods Inc.
  • Completion of culinary & process steam, hot water, compressed air, and condensate piping throughout cheese plant during production over a 2 year period
 
Earl Beatty Public School
  • New 11,000 cfm air-handling unit installation for pool ventilation and hot water heating complete with new fluid cooler, water-cooled screw chiller, heat recovery system, steam to hot water conversion, electrical, controls, sheet metal, and civil work.
 
 
Phone : 905-475-2920
Fax Line : 905-475-8249
Email : Info@gimco.ca
   
Technical Standards